CPR – Resolves Floor and Drain Problem

CUSTOMER: Hospital in Brampton

PROBLEM: Floor Drain Area was made too high and water was migrating out of the wash area.

SUBSTRATE: Concrete Floor Area

CPR: Built a framework with wood and tapered the material to the drain area.

Customer found us very resourceful to come up with this idea for him. Customer required a sloped ramp to access the area with carts.

 

PHOTOGRAPHS

Problem drain in wash up area.

Framework put in place.

Product mixed and being applied.

Finishing touches to job completion.